Ahlia University
SDG 6 Clean Water and Sanitation
GOAL 6 / 6.2 / 6.2.1

Measure the total volume of water used in the university that is taken from mains supply, desalinated, or extracted from rivers, lakes, or aquifers?

Home/SDG 6/6.2.1
SDG 6.2.1
SDG 6 Clean Water and Sanitation icon
Ahlia University | SDG 6.2.1

Water Consumption
Tracking

SDG 6.2.1: Measure the total volume of water used in the university that is taken from mains supply, desalinated, or extracted from rivers, lakes, or aquifers?

Ahlia University (Ahlia), the first private university licensed in the Kingdom of Bahrain, as a body systematically measures the total volume of water used in the whole university that is taken from the mains supply, and publishes the measurement. The University is housed in the Gosi Complex, Exhibition Road, Al-Hoora, Manama, a leased complex of two buildings with 10,386.35 m2 of built area. All of its water is treated mains water supplied by the Electricity and Water Authority of the Kingdom of Bahrain (EWA). The University runs no desalination plant, and it extracts no water from rivers, lakes or aquifers, so the measurement of the mains supply is the measurement of the total. The measurement is for the whole university and not for a part of it: the EWA bills cover the whole premises every month, and since 2024 sub-meters on each of the ten floors, read by Facilities and Maintenance, allocate the volume to buildings and floors.

In calendar 2025, which is the 2024/25 column, the University used 24,300 cubic metres (m3, equal to 24,300 kilolitres) of mains water, against 25,100 m3 in 2024 and 26,400 m3 in 2023, a fall of 8% over the three years. In the same period the campus population (students plus employees, by headcount) grew from 1,570 to 1,715, so water per person fell from 16.8 to 15.2 and then to 14.2 m3. The three-year total is 75,800 m3.

Mains water withdrawn (m3)
24,300
Campus population (headcount)
1,715
Water per person (m3)
14.2
Ahlia University | SDG 6.2.1

At a glance

Element of the question

Mains supply (treated water)
Standing activity or document: Monthly EWA bills for the whole premises, recorded in cubic metres
Owner: Facilities and Maintenance; Financial Affairs Directorate
Latest dated instance in 2025: Year-end reading, Wednesday 31 December 2025
Three-year figure: 75,800 m3
Desalinated and extracted water
Standing activity or document: None used: no own plant, borehole, river or lake abstraction
Owner: Facilities and Maintenance
Latest dated instance in 2025: Register review, Monday 17 February 2025
Three-year figure: 0 m3
Whole university, not part
Standing activity or document: Sub-meters on all ten floors of the two buildings, read monthly
Owner: Facilities and Maintenance with the complex operator
Latest dated instance in 2025: Calibration check, Tuesday 21 January 2025
Three-year figure: 10 floors metered
Register and reporting
Standing activity or document: Water register under Administrative Circular No. 820/2022, consolidated every quarter
Owner: SDG Unit, CAQA
Latest dated instance in 2025: Committee review, Monday 19 May 2025
Three-year figure: 12 quarterly consolidations
Per-person figure
Standing activity or document: Mains water per student and employee
Owner: SDG Unit with the University Registrar and the Human Resources Directorate
Latest dated instance in 2025: Committee review, Monday 8 December 2025
Three-year figure: 14.2 m3 in 2025
Leak control
Standing activity or document: Sub-meter alerts and maintenance tickets
Owner: Facilities and Maintenance
Latest dated instance in 2025: Quarterly leak review, Monday 29 September 2025
Three-year figure: 133 leak tickets

▪  Evidence for each element is cited in its own section below.

SDG 6.2.1 | Section 1

1. Mains supply: what is measured and how

The only source of water for the University is the public mains supply of EWA to the Gosi Complex premises. EWA bills the premises every month in cubic metres, and Facilities and Maintenance, which sits in the portfolio of the Vice President for Administrative and Financial Affairs, enters each bill in the water register on the day it is received; The Financial Affairs Directorate pays the bill and checks the volume against the register. The University does not own the building: the complex operator maintains the floor sub-meters, and the University reads them with the operator's technician on the last working day of every month. Two staff of Facilities and Maintenance sign each reading sheet, and the sum of the floor readings is reconciled with the EWA bill. In 2025 the two differed by 1.4% at most in any month, and the EWA bill is the figure of record.

Desalinated water and water extracted from rivers, lakes or aquifers are not used by the University on any of its grounds. For the year 2023 the University holds the whole-premises bill only; the floor sub-meters were fitted in January 2024 under the scheme described in section 3, which is why the floor allocation starts with the year 2024.

▪  Evidence: EWA monthly bills for the premises, 2023 to 2025, and the operator's sub-meter reading sheets, 2024 and 2025, held by Facilities and Maintenance [1]; Sustainability Data Register Procedure, Administrative Circular No. 820/2022 of 13 October 2022 [2]; University Sustainability Committee minutes, Monday 17 February 2025 [3].

SDG 6.2.1 | Section 2

2. The whole university: buildings and floors

Building 1 has a footprint of 1,498.73 m2 on five floors (7,493.65 m2) and Building 2 a footprint of 578.54 m2 on five floors (2,892.70 m2), together 10,386.35 m2. The table gives the 2025 sub-meter readings in cubic metres. The lowest floors use the most because they hold the cafeteria, the reception and the laboratories. Across the premises the University used 2.34 m3 of mains water for each square metre of built area in 2025.

BuildingFloor 1Floor 2Floor 3Floor 4Floor 5Total 2025Total 2024
Building 13,9003,7003,5003,4003,00017,50018,100
Building 21,5001,4001,3501,3001,2506,8007,000
Whole premises5,4005,1004,8504,7004,25024,30025,100

The calibration of the ten floor sub-meters was checked by the operator's technician with Facilities and Maintenance on Tuesday 21 January 2025, and all ten were within the 2% tolerance of the standard. The December reading was taken on Wednesday 31 December 2025, and it closes the 2025 volume reported under this indicator.

▪  Evidence: sub-meter reading sheets by floor, 2024 and 2025, and the calibration record of 21 January 2025, Facilities and Maintenance [1]; Campus building footprint page of the University, built areas of the two buildings [4].

SDG 6.2.1 | Section 3

3. Register, standard and review

Measurement is governed by the Water Metering and Consumption Reporting Standard (University Council Paper UC/P 630/2023 of 22 March 2023), which requires a monthly reading, an annual calibration check and five years of retention of the reading sheets. The Water Sub-metering Scheme (President's Decision No. 984/2023 of 4 December 2023) fitted a sub-meter on every floor of the two buildings from January 2024. The readings go into the water register of the Sustainability Data Register Procedure (Administrative Circular No. 820/2022 of 13 October 2022), which the SDG Unit within the Centre for Accreditation and Quality Assurance (CAQA) consolidates every quarter, so that there have been 12 consolidations in the three years 2023 to 2025.

The University Sustainability Committee reviews the register. On Monday 17 February 2025 it reviewed the 2024 volumes, on Monday 19 May 2025 the first quarter of 2025, on Monday 29 September 2025 the first half, and on Monday 8 December 2025 the per-person figures. The Climate Action Plan gives the same Committee the task of monitoring progress and reporting annually to the leadership.

▪  Evidence: UC/P 630/2023 of 22 March 2023 and President's Decision No. 984/2023 of 4 December 2023; water register and quarterly consolidations 2023 to 2025, SDG Unit, CAQA [2]; Committee minutes of 2025 [3]; Climate Action Plan, governance and monitoring.

SDG 6.2.1 | Section 4

4. Water per person

Water per person is the mains volume divided by the campus population, which here is the headcount of students plus employees: 1,310 + 260 = 1,570 in 2022/23, 1,375 + 274 = 1,649 in 2023/24 and 1,430 + 285 = 1,715 in 2024/25. The result is 26,400 / 1,570 = 16.8 m3, 25,100 / 1,649 = 15.2 m3 and 24,300 / 1,715 = 14.2 m3 per person.

▪  Evidence: student headcount by academic year, University Registrar; employee headcount, the Human Resources Directorate; water register, SDG Unit, CAQA [2].

SDG 6.2.1 | Section 5

5. Practices that keep consumption down

The Climate Action Policy of the University records the practices that Facilities and Maintenance applies on the premises: cleaning machines that save at least 80% of the water used by conventional washing, mopping only, no hoses on floors, brushing of debris, automatic devices in rest rooms that limit flushing water, spray irrigation, low-water plants, and a maintenance team that fixes leaks quickly. The sub-meters make the last practice measurable. Facilities and Maintenance logged 52 water-leak tickets in 2023, 44 in 2024 and 37 in 2025, and it closed 34 of the 37 tickets of 2025 within one working day (92%). The rest-room fixtures, the reuse of air-conditioning condensate and the planting are reported in detail under indicators 6.3.4, 6.4.2 and 6.3.5, and the reused volume is not deducted from the mains figure of this indicator.

▪  Evidence: Climate Action Policy, Water section; leak ticket register, Facilities and Maintenance, 2023 to 2025 [1].

Policy basis

Title: Water Management, Reuse and Pollution Prevention Policy. Approving instrument: University Council Paper UC/P 626/2023 of 22 March 2023, approved on that date and reviewed by University Council Paper UC/P 757/2025 of 26 February 2025. The measurement clause requires the University to measure all water it takes from the mains supply or from any other source, to read the meters monthly, to keep a register and to report the volume per person every year. It is applied through the Water Metering and Consumption Reporting Standard (UC/P 630/2023 of 22 March 2023), the Water Sub-metering Scheme (President's Decision No. 984/2023 of 4 December 2023) and the register procedure (Administrative Circular No. 820/2022 of 13 October 2022). Owner: Facilities and Maintenance, with the SDG Unit as reviewer. In 2024/25 the policy produced one whole-premises volume of 24,300 m3, ten floor readings and 12 monthly reading sheets. It is published on the University's Sustainable Development Goals portal with this indicator.

▪  Evidence: policy text and review record [7]; Administrative Circular No. 820/2022 [2].

Summary card of the policy that underpins indicator 6.2.1
The policy that underpins this indicator, as published by the University.
Timeline of the dated activities reported under indicator 6.2.1
Dated activities reported under this indicator, in order.
Ahlia University | SDG 6.2.1

Results by academic year

Registers are kept by calendar year, so the 2022/23 column is calendar 2023, the 2023/24 column is 2024 and the 2024/25 column is 2025; the scope is the Gosi Complex premises and nothing else. Water withdrawn is the volume of mains water billed by EWA in cubic metres. Campus population is the headcount of students plus employees. Water per person is the first line divided by the second: 26,400 / 1,570 = 16.8, 25,100 / 1,649 = 15.2 and 24,300 / 1,715 = 14.2. The three-year volume is 26,400 + 25,100 + 24,300 = 75,800 m3. Floors with sub-meters are 0 in 2023 and 10 in 2024 and 2025, and the 2025 floor readings add to 17,500 + 6,800 = 24,300 m3. Leak tickets closed within one working day are 42 of 52 in 2023, 38 of 44 in 2024 and 34 of 37 in 2025, which are 81%, 86% and 92%. Percentages are rounded to whole numbers.

Area chart of Mains water withdrawn (m3), Campus population (headcount), Water per person (m3) for the three academic years
Mains water withdrawn (m3); Campus population (headcount); Water per person (m3), by academic year.
Indicator2022/232023/242024/25
Mains water withdrawn (m3)26,40025,10024,300
Campus population (headcount)1,5701,6491,715
Water per person (m3)16.815.214.2
Floors with sub-meters01010
Leak tickets closed within one working day423834
Share of leak tickets closed within one working day81%86%92%

▪  Evidence: water register, bills, reading sheets and leak ticket register listed in the references [2], [1].

Publication and verification

The evidence for this indicator was approved by University Council Paper UC/P 830/2026 of 14 January 2026 together with the 2025 edition of the SDG reports (University Council Paper UC/P 829/2026 of the same day, published 21 January 2026) and was published on the University's Sustainable Development Goals portal on 28 January 2026, open to the public without login. The underlying registers are held by Facilities and Maintenance, with the SDG Unit within CAQA, and are quoted in the text above.

Indicator 6.2.1 at Ahlia University, in two minutes.
Ahlia University | SDG 6.2.1

Evidence and references

  1. Electricity and Water Authority monthly bills for the Gosi Complex premises, 2023 to 2025, and the operator's sub-meter readings, 2024 and 2025, Facilities and Maintenance
  2. Sustainability Data Register Procedure, Administrative Circular No. 820/2022 of 13 October 2022; water register kept by Facilities and Maintenance, consolidated each quarter by the SDG Unit, CAQA
  3. Minutes of the University Sustainability Committee, 17 February, 19 May, 29 September and 8 December 2025 (SDG Unit, CAQA)
  4. Ahlia University, Campus building footprint page with the carbon-footprint report (page modified 28 April 2025): Building 1 1,498.73 m2 on five floors, Building 2 578.54 m2 on five floors, total built area 10,386.35 m2
  5. Ahlia University, Climate Action Plan, section 3.3 Water Conservation and Governance and Monitoring (page modified 28 April 2025) https://www.ahlia.edu.bh/climate-action-plan/
  6. Ahlia University, Climate Action Policy page, Water section (page modified 24 May 2024): water-efficient cleaning machines, mopping only, no hoses, automatic devices in rest rooms, spray irrigation, low-water plants, a maintenance team that fixes leaks quickly https://www.ahlia.edu.bh/climate-action-policy/
  7. Water Management, Reuse and Pollution Prevention Policy, University Council Paper UC/P 626/2023 of 22 March 2023, reviewed by UC/P 757/2025 of 26 February 2025; owner Facilities and Maintenance

Contact Us

General Enquiries